Blueprint
Materials Required:
- Plywood or wooden boards
- Rope or twine
- Duct tape or adhesives
- Plastic barrels or flotation devices
- Decorative materials (e.g., paints, markers, fabrics)
- Tools (e.g., saws, hammers, scissors)
- Safety equipment (e.g., life jackets, gloves)
Team Formation:
- Divide participants into teams of 6-8 members
- Encourage diversity in team composition
Pre-Activity Briefing:
- Explain the objectives and rules of the activity
- Demonstrate the materials and their intended usage
- Emphasize the importance of teamwork, creativity, and safety
Design and Construction Phase:
- Allocate a specific time frame (e.g., 2-3 hours) for teams to design and construct their boats
- Encourage teams to plan their designs, assign roles, and manage resources effectively
- Facilitate collaboration, communication, and problem-solving within teams
Boat Evaluation:
- Teams present their completed boats to the facilitators
- Facilitators evaluate the boats based on design, functionality, and adherence to safety guidelines
Aquatic Challenge:
- Teams launch their boats into a designated body of water (e.g., lake, pool)
- Teams must board their boats and complete a set of aquatic challenges or tasks
- Challenges may include races, obstacle courses, or team-based activities